Refurbishment of the Female, Male and PWD Amenities at the Lavarack Barracks Swimming Pool
September 2022 – November 2022
SHP Construction & Civil carried out an internal and external repaint of the building after first cleaning, repairing of holes and cracks, and treating of corrosion. Existing benches were completely refurbished including the removal and replacement of existing legs and fixtures with stainless steel ones and the sanding back and refitting of all wooden slats. All sanitary fixtures and fittings were replaced, and some additional ones installed, including the upgrade of the PWD toilet to meet compliance standards.
